Johan Castberg Fpso Singapore
The hull is under construction in Singapore and the turret is being built in Dubai. The safety authority said that extensive repair work is required. Topside Modules For The Johan Castberg Project To Be Fabricated At Epg Poland At Sea Maritime Economy Portal Dutch floater specialist SBM Offshore on Monday announced the sailaway of the last two modules for the Turret Mooring System destined for Singapore for integration into the hull of Equinors Johan Castberg FPSO. Johan castberg fpso singapore . The final two modules for the turret mooring system TMS for Equinors Johan Castberg floating production storage and offloading FPSO vessel have headed to Singapore for integration into the FPSOs hull. Air handling Units II 3G IIA T3 7 No. Located in the Barents Sea the Johan Castberg field lies 240 kilometres north-west of Hammerfest and it will be developed with a 200-metre long FPSO. Kvaerner is in charge of building the topsides. Construction on Johan Castberg FPSO topside begi...